We made two trips up to the house this week (Friday and Saturday). Friday was to meet with the superintendent to discuss an issue with the placement of the light fixtures in the master bath. The master bathroom has been one concern after another – some due to regretting some of the selections we made and other issues that were completely out of our control. The most difficult part of building this home is realizing it won’t be perfect. We stink at making decisions and I’m the Queen of Returns – neither which mix well with putting together an entire home. Thankfully, the awesome, wonderful things far outweigh the things I wish we would’ve done differently.
Changes this week include:
The fireplace being completed, carpet installed, and trim painted
The kitchen backsplash installed (still needs grout though) and most of the appliances are in place
Justin is double checking the measurements of the space for our fridge so we can purchase one this weekend
The countertops in the downstairs bath and master bath were installed
Here Jason is having fun playing with the drawers in the downstairs bathroom. This was the marble that was supposed to be installed in the master bath as well but they couldn’t find a slab long enough (sniff, sniff - I really like it)
The kids bathroom just needs a mirror and it’s ready for use (oh, and a little cleanup would be nice too)

The landscaping is complete and they were painting the fence yesterday afternoon.
Unfortunately, the homeowners association dictates the color of the fence and it’s a dull grayish color. This is the last picture of our fence looking a-natural.